Main Shop

We fabricate, paint and assemble structural steel members and components in a 90,000 sq ft state-of-the-art facility. Using our 25-ton crane capacity in the main shop, we move materials from prep through to inspection. Our skilled personnel transform raw steel into a superior product on highly automated Peddinghaus, FICEP, Blastec and Koike equipment, fabricated to your exact specifications.
Featured Projects
Tappan Zee Bridge
At 3.5 miles long, the Tappan Zee Bridge is one of the longest bridges in the United States.
Gowanus Expressway
MC Ironworks has worked on this historic roadway through various contracts dating back to 1991.





